Library and Community Center Construction Documents

Home » Select Board » Library and Community Center Construction Documents

The following Library and Community Center construction documents have been submitted to the Select Board by the Cornish Community Initiative (CCI) and are available to the public. Click on the arrows in the upper right-hand corner of each box to open the drop-down.

CONSTRUCTION DRAWINGS:
Issued for construction drawings and bulletins. Bulletins reflect most, but not all, architectural deviations from the base contract construction drawings. Minor adjustments not reflected in the bulletin are captured in RFI (Folder 3). The MEP (Mechanical-Electrical-Plumbing) addendum captures all MEP changes from the base contract construction drawings.

RFI (Requests for Information):
All project RFI documents, including Trumbull-Nelson’s markups and questions, as well as the design team (Architect and Engineer) responses.

NH FIRE MARSHALL ISSUED REPORTS:
All inspections to date except for Electrical which will be shared when we obtain access to the report. To read the Inspection Reports, please keep this in mind:
– The relevant columns are Inspection and Status.
– ‘Inactive’ status means it does not apply to this project.
– ‘Pending Request’ status means the inspection has yet to take place.
– ‘Partial’ status means there will be another inspection to obtain the final pass.

ASBESTOS REMEDIATION:
Report certifying compliant state of remediation and remaining asbestos encapsulation.
We (T-N) found asbestos floor tile when we were digging a trench for embedded plumbing. As described in point 5, it has been fully encapsulated. However, we do not know where other asbestos could be located because we had no need to remove any other subflooring.

MOLD REMEDIATION: Report certifying compliant state of mold remediation.